fbpx
Talk to an Expert
01/07/2019  
Share

Akura was engaged to deliver a U-Select™ Structural Package inclusive of 1,150sqm of precast concrete panels and 15 tonnes of structural steel, for the construction of a new commercial development; located in Vineyard, NSW.

Having installed both steel and panels in under 3 weeks, this project demonstrates our ability to deliver engineered structural building packages – fast.

Our client was so pleased with the quality of materials and accuracy of the two materials coming together, that he has changed the way he traditionally approached steel and panels – a great result!

HOW WE ADD VALUE FOR YOU

Fast Lead Times Given we manufacture our own steel and panels, the production of materials can commence as soon as your order is received
Greater Accuracy The interface between both structural steel and precast concrete panels has greater accuracy due to coordinated drafting
Enhanced Project Management More control over the construction process; minimising errors and allowing for enhanced project management
Streamlined Construction Ability to install structural steel in conjunction with precast panels achieving additional construction efficiency
Customised To You U-Select™ Engineered Structural Building Packages gives you the ability to customise your package specific to your project needs
Achitecturally Designed Features The integration of decorative awnings and designed columns, along with the application of unlimited designs and finishes to panels gives your project some serious street appeal

OUR PROMISES TO YOU

Fast Build Times - From As Little As 3 Weeks*

No Variations - Fixed Price & On-Time Guarantees

Dedicated Project Specialist

KEEP POSTED ON INDUSTRY NEWS, UPCOMING EVENTS & PROJECTS