Home » Resource Recovery Centre
Akura was engaged to provide a lock-up package for the construction of this Resource Recover Centre; operated by Orange City Council and Wangarang.
Located on Ophir Rd in Orange, NSW; the project presented a number of challenges for the Akura team, such as required height, wide doorways, stepped and raised platforms, a corrosive environment, push walls for heavy machinery and the integration of equipment.
Akura’s scope included the design and construct of the footings, structure and 300mm precast walls – inclusive of the development of a unique steel restraining system for these heavily loaded precast, push walls. In addition, Akura managed the installation of roofing and plumbing.
We have both a professional and personal interest in delivering high quality outcomes, underpinned by friendly and approachable staff.
Our architect, engineer and drafting team work seamlessly to deliver a building that is designed for your eye, budget and needs.
Your Akura Project Manager is involved from day one, helping to tailor the design, get it through Council and oversee its successful development to ensure it fully meets your needs.
Supported by our ability to manufacture both structural steel and precast concrete panels, Akura has removed the need for management of multiple service providers.
Because we own our trucks, mobile cranes and earthmoving equipment we have near complete control of construction.
Akura has the in-house expertise to complete every aspect of your project from concept to completion.
Fast build times - From as little as 3 weeks*
Dedicated Project Specialist
No variations - Fixed price and on-time guarantees
Get a quote and/or have your questions answered by one of our project consultants.
Things that may help with your enquiry:
Copyright Akura | Website by DigitL FX