Purpose-Built Warehouse Facility in Moss Vale
Address
6 Red Fields Road, Moss Vale NSWProject Type
Warehouse & Office Space
Site Area
3,395 sqm
Gross Floor Area
2,119 sqm
Akura delivered a purpose-built warehouse and office facility for Obex Group in Moss Vale, designed to align with their global brand standards and support efficient operations. Delivered under a fully integrated design and construct model, the project ensured consistency from concept through to completion and was finished eight weeks ahead of schedule, combining quality construction with a future-ready design.


High-performance design aligned with global standards
Located in Moss Vale, the facility combines efficient warehouse functionality with a considered office environment. Full-height precast construction delivers durability, while a 9.4-metre internal clearance maximises storage flexibility. The site layout supports smooth heavy vehicle access, circulation and loading, ensuring efficient day-to-day operations. Natural light and EV-ready infrastructure further support usability, efficiency and future adaptability.
Overview
The development features a 9.4-metre clear internal warehouse height to maximise storage capacity, supported by full-height precast construction for durability and long-term performance, alongside a thoughtfully designed office that incorporates natural light and functional layouts to enhance staff comfort and productivity.
Our Process
Akura delivered the project as a fully integrated design and construct partner, managing design, approvals, manufacturing, and construction under one contract, ensuring a streamlined process, consistent quality, and clear communication throughout.
Key Outcomes
Completed approximately eight weeks ahead of schedule, the project provides a high-performing, future-ready facility that supports operational efficiency, reduces long-term maintenance, and delivers a workplace that strengthens team productivity and pride.




“We wanted a facility in Australia that matched the standard of our UK headquarters, and Akura delivered exactly that. They handled everything from concept through to completion, which took a lot of stress away. We finished around eight weeks ahead of schedule, which is pretty unheard of in construction.”Tom Francis AU Managing Director / Obex AU
Weeks ahead of schedule
8
Total gross floor area
2119
Internal clearance for maximum storage capacity (9.4m)
9