Lock It In

Secure your engineered steel and precast packages before 30th June 2026

Lock in guaranteed production for engineered steel and precast packages before 30 June 2026, ahead of the Olympic-driven demand surge across the Eastern Seaboard.

Unlock up to $10,000 before EOFY. Tiered reward for projects secured by 30 June 2026

Secure your production slot now

This field is for validation purposes and should be left unchanged.
Name(Required)

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Consent(Required)

Deadline: 30 June 2026.

Projects must be signed by this date to qualify for the $2,500–$10,000 incentive. Limited Q2 slots remaining.

Why act now?

Australia is entering a major construction surge. The key risk isn’t just rising costs, it’s securing production capacity before it’s no longer available.

Construction demand is accelerating

The Brisbane 2032 Olympics is already pulling major infrastructure spend forward. Venues, transport and accommodation projects across South-East Queensland are absorbing capacity now, years before the games.

construction site with steel and precast system

Capacity is tightening fast

Skilled labour, long-lead materials and manufacturing slots are shifting to support Olympic-related projects. Available production windows for steel and precast packages are already shrinking across the Eastern Seaboard.

Costs are rising

As demand increases, both pricing and availability become unpredictable. Securing your production allocation early with one supplier helps protect your timeline, ensuring you have product when you need it, and with less risk.

What you secure when you move early

Akura’s engineered steel and precast system brings design, manufacturing and installation together, giving you confidence in both delivery and timeline.

  • One supplier for steel and precast. Reduce risk by not needing to split supply between different companies
  • Guaranteed production allocation. Secure your manufacturing slot before capacity is absorbed​
  • Structured scheduling certainty. Greater control over timelines and site coordination​
  • Reduced exposure to market shifts. Early commitment helps minimise risk as demand increases
  • The Akura speed and quality advantage. Fully integrated design, manufacture and install package​
man in construction uniform handling concrete slab

We’re rewarding early commitment

Projects secured by 30 June 2026 are eligible for tiered incentives, designed to reward early commitment and forward planning.

Reward Tiers

  • Entry tier: $2,500
  • Mid tier: $5,000
  • Maximum reward: $10,000

Incentive payable upon signed contract for supply. Both qualifying referrer and purchaser are eligible. Terms and conditions apply.

Trusted by builders & developers across Australia

Years delivering

50

Projects completed

650

Dedicated Akura people

120

“I am very impressed with the way the steel and panels went together so easily, there were no hiccups on site. I have always done my own tilt panels but this system has led to me changing the way I do panels and steel.”
— Managing Director | Robert Calvert | Calcorp

We’re Rewarding Early Commitment

At Akura, we value early planning and long-term commitment. We’re looking to partner with builders and developers who want to secure certainty ahead of the inevitable construction surge.

Through our ‘Lock It In’ Program, projects secured with a contract by 30th June 2026 are eligible for some great tiered incentives ranging from $2,500 to $10,000*. Both the qualifying referrer and purchaser for the project are eligible upon a signed contract for supply.

With limited production spots available for pre-cast and structural steel in the next few months, early engagement not only secures capacity, it also unlocks the added benefit of this incentive program.

Terms and Conditions

Read the full terms and conditions here.